Traffic Calming Choices
Related Information
Traffic Calming Choices
Neighborhoods may choose between the Expedited Speed Hump Program or the Full Traffic Calming Program.

Expedited Speed Hump Program
The expedited program was created as an alternative for neighborhoods interested only in speed humps and reduces the need for educational requirements, traffic studies, and qualifying criteria. The Speed Hump Program consists of non-physical and vertical measures only and usually proceeds from neighborhood kick-off meeting to construction in as little as 3 to 4 months.
Full Traffic Calming Program
Full Traffic Calming Program consists of all available traffic calming measures. Generally a design consultant must be hired to design the plan and in addition to neighborhood approval, it requires approval by the City Council before the plan is put out to bid for construction. Overall, the costs of the Full Program are much higher.
External Links
There are currently no external links.
This City of Stockton web page last reviewed on --- 3/21/2012